Products and quantities
The swim-short record covered 300 pieces in a nylon-spandex fabric, while the linen-pants record covered 445 pieces in 100% linen.
- 300 swim shorts
- 445 linen pants
- Two dated internal records
INTERNAL QUALITY-CONTROL CASE
Two internal production records dated July 20 and 21, 2026 covered 300 swim shorts and 445 linen pants. They recorded quantity, appearance, measurement, fabric, workmanship, trims, decoration, packaging and function checks. The records were produced internally and the retained copies were unsigned, so this page does not present them as third-party certification.

PRACTICAL SOURCING ANSWERS
These answers describe Jinfengtu's current working scope. Final terms are confirmed against the actual style, material, print, color split and delivery requirement.
The swim-short record covered 300 pieces in a nylon-spandex fabric, while the linen-pants record covered 445 pieces in 100% linen.
The bilingual forms listed quantity, visible appearance, key measurements, fabric, workmanship, trims, decoration, packaging and functional performance.
The internal forms recorded an accepted result and stated that production was complete and waiting for packaging. That statement is reported as the factory's own record, not independent verification.
A buyer can specify an approved sample, measurement tolerances, AQL level, defect definitions, inspection stage and whether an independent inspector must sign the final report.
DIRECT FACTORY ANSWERS
Written for international brands, importers, wholesalers and sourcing teams evaluating a beach shorts supplier.
One record covered 300 stretch-woven swim shorts and the other covered 445 linen pants.
The forms covered quantity, appearance, measurements, fabric, workmanship, trims, print or embroidery, packaging and functional checks.
No. They were supplier-generated internal records and the retained copies were unsigned. They must not be described as independent inspection certificates.
Yes. The inspection level, sampling method, defect limits, inspector and reporting format should be agreed before production. An independent inspection can be arranged when required by the buyer.
START A PROJECT REVIEW
Share the style, quantity, target market, fabric or print direction, size range and delivery window. Ethan will review whether the 30–50 piece starting range fits your construction.